EQUIPMENT / PRINCIPLE / DESIGN

Robot seventh axis / rail

Moves the robot base along a seventh axis or floor track so it can serve a larger working range along the line.

Equipment principle & structureRequest design help ↗
Güdel TMF-4-B (maker render): robot on a floor-track carriage, cable chain behind
Güdel TMF-4-B (maker render): robot on a floor-track carriage, cable chain behind · Source: Güdel website ↗ · © the manufacturer, quoted for reference · Resized proportionally and converted to WebP
Robot seventh axis / rail · original schematic, not to scale; shows the working principle and modules
Robot seventh axis / rail · original schematic, not to scale; shows the working principle and modules
Robot seventh axis / rail · Model structure reference
Robot seventh axis / rail · Model structure reference · Mechanical Resource Library on WeChat · original model image with original markings · User-provided model reference; no ownership transfer asserted · Original source image; natural pixels, original marks retained
Güdel TMF floor track (maker render): no robot, red adapter plate, cable chain
Güdel TMF floor track (maker render): no robot, red adapter plate, cable chain · Source: Güdel website ↗ · © the manufacturer, quoted for reference · Resized proportionally and converted to WebP
Robot mounting plate (maker render): four mounting pads, cable chain behind
Robot mounting plate (maker render): four mounting pads, cable chain behind · Source: Güdel website ↗ · © the manufacturer, quoted for reference · Resized proportionally and converted to WebP

What it does

Moves the robot base along a seventh axis or floor track so it can serve a larger working range along the line.

How it works

The robot is mounted on a guided carriage driven along the track, and the controller links the external axis to robot coordinates and motion model. Rack and pinion is a common drive for long-travel tracks, and carriage, track, cable chain and mounting datum all affect operation.

Process sequence

  1. Confirm datum and safety zone
  2. Position the external axis or move it in coordination
  3. Robot performs the process
  4. Travel to the next work zone
  5. Confirm arrival and continue
  6. Return to the set position

Key inputs

  1. Robot and tooling payload
  2. Track length and foundation
  3. Transmission and lubrication
  4. Coordinated control, cabling and guarded area

Common problems

  1. Track joints and foundation deformation affecting accuracy
  2. Contaminated rack or guides or poor lubrication
  3. Cable chain interference
  4. External axis calibration errors causing path deviation

Limits of application

  1. A track moves the robot while a positioner moves the part; they serve different roles
  2. Coordinated and independent axis capability depends on the controller
  3. Added travel must also be included in the cell's guarding

Functional modules

Track and foundation

Set the motion datum

Carriage and linear guides

Carry the robot

Motor and transmission

Drive travel along the track

Control, calibration and cable chain

Link the external axis and protect cables

Manufacturer & technical sources

Continue with manufacturer product pages, operating principles and technical information for this equipment type.

Related model references

ONLY ON MECHWIKI / AGGREGATED

Aggregated references: models, makers, patents & videos

References scattered across model articles, vendor sites and patent databases, gathered under this machine. Checked items are listed; the rest are offered as ready-to-open searches.

Patents: how others built it

Patents are useful for drawings and mechanism ideas. None has been vetted for this entry yet, so here are searches pre-filled with the machine name.

Videos: see it run

No licensed video is hosted for this machine yet; these searches are pre-filled with its name.

3D MODELS

3D models and download information

Explore structure and assembly with models. Download methods, file formats and terms are provided by the original article or mini program.

Find more in the model library →